Recently active
Coping with the dynamic design processThe design process of our projects is very dynamic. It includes a lot of trial and error and goes through many iterations as it has many disciplines that all have their relevant input. The final outcome is generally a combination of multiple propositions.In the example of a plant layout for a bulk handling installation, the installation is built with bunkers, conveyors, hoppers and buildings housing process equipment. Usually such installations are connected with existing installations, surrounding our project. In some cases, our installation will be interacting with future projects and must already give an impression of that future installation.Designing a layout in 2DIn the past the design of such projects was completely executed in 2D. Plant layout was really easy in the initial stages. A bunker could be represented by a simple rectangle, the belts conveyor was copied from earlier projects and was then literally ‘stretched’ to give an early indi
For about two months now, we have migrated from CoCreate Workmanager and OneSpace Designer Drafting 14.An upgrade to Creo Elements Direct Drafting 18 allowed us to use Windchill's Workgroup Manager for Drafting. Our PTC Software Partner, Savaco, has greatly supported us to have a Bill Of Materials module that both makes use of Windchill parts, and resembles our historic way of working. This allows the users to recognize the system quite quickly and make benefit of what we were able to do with part structures that we've had already, built by Creo Elements/Pro model structures.We've finally joined the best of two worlds together. Part structures in Windchill can now find their origin in both 2D and 3D software. Viewables in PDF format can now be generated by Drafting or Creo Elements/Pro, and nobody needs to care when looking for information.The biggest step forward however is that our Windchill Parts structures for Drafting BOMs all use the parts we already had in Windchill. Compared to
For the first time today I have witnessed a project manager joining a designer on the same workstation and discuss a design directly on the model. The project is a complete bulk handling installation with silo's, conveyors and bunkers, and is still in its very early stages. Lost of design changes are normal, and where this process used to take place on paper or in 2D Drafting at best, it was a real pleasure to see even the persons I thought to be the most reluctant also try to move to 3D. At last. Finally. Phew...
Engicon is evolving, certainly by the way we organize our product design. Major players in this game are the Engineering Department, the Production Department and the actual projects. With the overall drawback in economy, projects aren't that easy to score as we were used to. As a result, we need to improve. "Shorter time-to-markets, better templates and better reuse of existing objects ! ", we hear you all proclaim. However, we are sure that our Engineering-to-order projects are one of our biggest assets, so it isn't just that easy to incorporate these well-known statements.We're moving forward. It's pretty bold to say this, but I really think we are. We are genuinly getting rid of all the old fashion ways of working. Endless streams of paperwork, drawings, lists, checklists, ... are quite succesfully moved into our reducing software stack. We no longer have an almost unlimited number of diverse programs that each store their piece of the puzzle. We design in 2D and 3D, and are actual
In 2006 we needed PDM. We had PDM, but no parts. And no 3D model management, only 2D drawings. We had a huge custumized environment, sending drawing BOMs to a prehistoric ERP. The limited number of parts in that ERP environment were outdated. Materials had changed standards had appeared and disappeared, new types of raw materials and classes of parts we required but never added to the ERP..."The best solution to start with a high level of Part management", our software reseller promised us," is Windchill." They just started coöperation with PTC after a long time they just sold CoCreate Software. Little did they know that PTC would aquire CoCreate. Or maybe they did, but that didn't really matter.So we started of with Windchill 8.0 and shortly after that, Engicon Management didn't want to miss the evolution to 3D any longer and wanted a parametric modeler. Direct modeling had been evaluated, but given the nature of our products, a parametric modeler was more appropriate. "Move this conn
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.