Skip to main content
juil. 25, 2013 8:34 AM UTC

How we started using PTC software

In 2006 we needed PDM. We had PDM, but no parts. And no 3D model management, only 2D drawings. We had a huge custumized environment, sending drawing BOMs to a prehistoric ERP. The limited number of parts in that ERP environment were outdated. Materials had changed standards had appeared and disappeared, new types of raw materials and classes of parts we required but never added to the ERP...

"The best solution to start with a high level of Part management", our software reseller promised us," is Windchill." They just started coöperation with PTC after a long time they just sold CoCreate Software. Little did they know that PTC would aquire CoCreate. Or maybe they did, but that didn't really matter.

So we started of with Windchill 8.0 and shortly after that, Engicon Management didn't want to miss the evolution to 3D any longer and wanted a parametric modeler. Direct modeling had been evaluated, but given the nature of our products, a parametric modeler was more appropriate. "Move this connection and all attached parts and framework from an orientation of 30° to 60°" is a statement very commonly heard in the engineering department. Windchill, from PTC, and Pro/Engineer WF3, from PTC. Other suppliers promised high tech workgroupmanagers for a seamless CAD to PDM integration. Our best decision ever, go with software from the same supplier. When we look back at this, and make a summary of the comlex tasks we've performed in workspaces, family tables, synchronization, updates, copies, reuse, ..., we're happy that Windchill and Pro/Engineer did understand eachother very well.