Skip to main content
Mar 20, 2017 1:47 PM UTC
Question

How do you run parallel GetHostData processes?

Hi,

In SPP 9.6.4 and above, there is a way to run GetHostData processes in parallel, as long as the data doesn't overlap. I think that this is configured by referencing a Process Group when running GetHostData but I'm not sure how to associate a Process Group with different parts/locations.

I know that something like this is possible because in 9.6.4 the GetHostData process was improved to allow users to Import data at the same time that GetHostData was running in a different region and the two processes would affect each other.

Does anyone have any details on how to configure GetHostData to run multiple processes in parallel?

    2 replies

    Mar 23, 2017 10:31 AM UTC

    Hi Kathy,

    Here's what you need to do to configure Process Groups:

    1. Turn on GS for Process Groups: ENABLE_PROCES_GROUP_UI and MANUAL_AP_PROCESS_GROUP.

    2. From Manage System-->Base Setup-->Process Group UI, create the necessary process groups.

    3. Then associate the locations to a process groups, from Edit locations page. Please note that, it doesn;t impact the parallel processing. It just for knowledge that which process group should contain which location data, to avoid overlap.

    4. Then for GetHostData, update the ProcessGroupIDs with the respective DownloadIDs in IPCSDD_DOWNLOAD_PROCESS table.

    5. Then go to the AP page, select the process group and kick-off the GetHostData. Only those DownloadIDs will be process which have the matching ProceGroupID.

    6. To kick off another GetHostData in parallel, again select the next ProcesGroupID and kick of the GetHostData process.

    I hope it answers your question.

    Mar 23, 2017 12:23 PM UTC

    That's very clear. Thanks Rahul!!