Tips When Loading Planned Dates Through GetHostData

Entering Planned Order Dates through GetHostData can cause unexpected errors when leaving some of the Planned Dates empty. Order Plan tracks four Planned Dates: 1) Planned Order Date, 2) Planned Ship Date, 3) Planned Receive Date, and 4) Planned Available Date. These dates must have values in the sequence given. Order Date first, Available Date last.

The lead time between each of these dates can be established through parameters and attributes.

If only one of the planned dates is provided when entering orders through GetHostData, GetHostData will calculate the other three dates, provided the lead times are established.

GetHostData errors can occur when:

1) Lead time is missing between Order and Ship, Ship and Receive, or Receive and Available.

2) More than one Planned Date is provided but not all four dates.

When all four Planned Dates are provided, GetHostData creates (or updates) the order and sets the Planned Dates based on the information in the download table. If there is only one Planned Date set, Order Plan will derive the other three Planned Dates, using the lead times. If two or three Planned Dates are present, GetHostData doesn't know which of the dates to use as the source and this will cause an error during GetHostData.