View Manager Window, Simplified Reps Tab - Columns for "Last Saved Date" and "Last Saved By"
Please include detailed documentation such as screenshots, images or video.
1. What product and version are you running?
CREO Parameteric 9.0.6.0
2. What is the problem?
Would like to have 2 columns added to the Simp Rep Tab in the View Manager Window that automatically shows the Simplified Reps "Last Saved Date" and who it was "Last Saved By". Being able to sort those columns in ascending or descending order will be beneficial too.

3. Are you using a workaround? If yes, please describe it.
Workaround is putting the initialization date and/or initials of the engineers that worked on it last in the Simp Rep Title, which takes away characters from describing what the Simplified Rep shows.
I've also heard about the Description Column, but I have not used it extensively and my concern is new engineers would not be aware of it either and end up not using it or updating descriptions incorrectly.
4. What is the use case for your organization? Describe how your idea would work in context or how it would apply to a practical situation.
Having the 2 columns automatically showing when Simplified Reps are last saved and by which engineers will allow more characters in the Simp Rep Name to describe what the Simplified Rep depicts.
5. What impact does this problem currently have on your organization? (Number of users affected, hours of lost productivity, etc.)
Approximately 600 engineers and likely 100 non-engineers (system administrators, technicians, back-office). It is hard to put a number on hours because if there are 20 Simp Reps in an assembly and the Names include the Dates and Engineers, but they were manually entered and not automatically updated the last time the Simplified Rep was saved, then and engineer may spend 3-5 minutes per rep trying to understand if it is the latest and greatest against other reference materials. If 1 engineer experiences this once or twice a year for 20 simplified reps, for our company, that could result in:
Min: 3 min x 20 Simp Reps x 700 personnel / 60 min x 1 / year = 700 hours/year
Max: 5 min x 20 Simp Reps x 700 personnel / 60 min x 2 / year = 2,333 hours/year
