Skip to main content
Mar 29, 2013 3:28 PM UTC
Acknowledged

Link the drawing sheet tabs to the drawing sheet numbers

Related products:Creo Parametric

An example. User has a 70 sheet drawing and wants to move (for example) sheet 60 to be sheet 3. The tabs will then show sheet1, sheet2, sheet60, sheet3. The tabs do not now link up with the sheet numbers. This means that if he then wants the sheet tab numbers to show correct sequentially, he has to modify the text in all tabs after sheet 2.

I'm aware that the tabs show the sheet name and are not linked to the sheet number but this can be confusing. A config.pro option which would link them would improve functionality and reduce confusion caused.

12 replies

Jun 23, 2016 7:05 PM UTC

I would agree that a new Idea would be the best way to track this request.

If we only do the sheet numbering improvements, but not the improved zone callouts, and then I mark this idea as completed, we'll lose track of that second idea.

Jun 14, 2018 6:31 PM UTC
Status changed to: Acknowledged